08/09/2008 Unidad Academica de Estudos Superiores Huixquilucan
Manufacture and assembly of metal structures screwed
Three-tier structure based on columns of 4 plates welded and obstacles IPR
117 tonnes in 1500 m2
 
 
30/06/2008 Unidad Academica de Estudios superiores Villa Victoria
Manufacture and assembly of metal structures screwed
Three-tier structure based on columns of 4 plates welded and obstacles IPR
117 tonnes in 1500 m2 area covered with foil losacero of shear bolts nelson
 
 
14/04/2008 Plaza El Punto Alfredo del Mazo Toluca, Edo de Mex.

Design, manufacture and assembly of metal structures (400 tons). Losacero System5000 m2 on two levels and a basement

Agencies Cars, buildings and parking in the basement and r ...

 
 
01/04/2008 Edificio de Aulas Preparatoria Siglo XXI Toluca Edo. de Mexico
Design, manufacture and assembly of welded metal structure
Two-tier structure based on columns and obstacles HSS IPR
60 tons in 800 m2 of indoor area with bolts losacero channel
 
 
18/03/2008 Edificio de la Biblioteca de la Universidad Siglo XXI Zinacantepec Edo de Mexico

Design Manufacture and assembly of metal structures 1000 m2 of laminated losacero deck 25, 65 tonnes of structure-based IPR beams and columns of HSS in a plant ready for a second level Zinacantepec State of Mexico

 
 
16/10/2007 Plaza Comercial Las Fuentes Metepec Edo. de Mexico
Design, manufacture and assembly of welded metal structure
Three-tier structure based on columns of 4 plates and obstacles saoldadas IPR
300 tons in 5000 m2 area with roof bolts losacero of channel
 
 
24/08/2007 Plaza Comercial IZAR, Metepec, Edo de Mex.

Commercial Plaza on two levels and a basement, mixed concrete columns and obstacles metal

Profitable area of 4200 m2 and 1400 m2 of basement.

Metallic structures, walls contecion, mezzanine slabs, covered with foil, block walls, floors and finishes

 
 
23/08/2007 Estructura Metálica del Centro Comercial Plaza Península, Metepec, Edo de Méx
Mall Plaza Península Metepec Edo de Mex. Three-tier structure 7500m2 and 500 ton: Main structure into three levels based on 4 plates welded columns and work of IPR, soldered connections, losacero sheeting and covered in mezzanine
 
 
23/08/2007 Laboratorios Silanes, Parque Toluca 2000, Edo de Mex
Metal structure of the dining room and offices offices on two levels 16 meters x 16 meters (45 ton): Main structure based tube columns and obstacles profile IPR bolted connections in mezzanine; cover two water-based channel largeros ride . Dining on two levels 22 meters x 60 meters (85 ton): Mezanine interior columns based HSS profile and work profile IPR covered based tube columns and work of three plates welded in the form of wave, with bolted connections . Wall plate height of 11 meters on three sections of 22 meters long (125 tonnes): Forme ...
 
 
23/08/2007 Torre Mayor Reichmann International, Mex. DF
Project: Approval detail engineering standards Secofi Electrical Engineering Work Value: Lighting areas in basements and service areas and rooms electrical substations and systems of land and exterior lighting arresters in high voltage Power Installation provisional cranes, steel structure Concentration Meter Automation Power of lighting power plant emergency kva 2000 Fire Protection Electroducto heliport lighting feeder vertical and horizontal
 
 
22/08/2007 Agencia Bimbo, San Antonio la Isla, Edo de Mex.

Projects: 5000 m2 of hall
Calculation and design of the steel structure and foundations
Engineering and detail
5000 m2 of warehouse construction
Surface arrangements of land , foundation, masonry, flooring, Herrerías, Steel Structure, Construction Foreign Drainages and parking

 

 
 
22/08/2007 Nave Industrial Essencefleur, Lerma Edo de Mex
Projects: 2500 m2 of hall
Calculation and design of the steel structure and foundations
Engineering and detail
2500 m2 of warehouse construction
Terracerías, foundation, masonry, flooring, Herrerías, steel structure, lamination, External Works, Drainage and Parking
Elctromecánicas facilities and hidrosanitarias
 
 
22/08/2007 Centro Universitario México, Tláhuac, D.F.

Metal structure of the buildings in classrooms Centro Universitario México, Tláhuac, D.F.
Classroom buildings, three modules 12m x 50m (750 tonnes)
Main structure of columns based IPR 18 "x 11", lock IPR, bolted connections, secondary structure-based IPR, contraventeos facade tube-based system mezzanine to foil losacero basis.


 

 
 